INTERNAL TRAINING ON MAGNUM VENUS EQUIPMENT

CHECKLIST 03
SET UP CHECKLIST FOR FIT
ACTIVITIES MUST BE DONE IN THE SEQUENCE SHOWN, AND MUST BE TICKED OFF
AS COMPLETED. USE THIS CHECKLIST IN CONJUNCTION WITH THE OPERATING
MANUAL FOR THE ULTRAMAX UNIT. THIS SEQUENCE FOLLOWS ON FROM
CHECKLIST 02 – START UP CHECKLIST
ACTIVITY
NO.

ACTIVITY
Priority Put on Respirator as specified for spray painting,
TICK WHEN COMPLETED
Protective Clothing, Eye Protection, and PVC Gloves Apply Red grease to the Mix Housing Threads. Insert the Turbulent Mixer into the Stainless Steel Mix Housing Chamber. It must have a tight fit. (2,25 kg or less per minute, use Critical Turbulent Mixer, for more than 2,25kg per minute, use Standard Turbulent Mixer.) Install the FIT spray tip and nozzle cap onto the Mix Chamber (do not overtighten) Spray a test pattern onto a wide paper test strip. Observe the pattern.  Too wide with poorly defined “horns” – turn down the
pump pressure
 Too narrow but with well defined “horns” – turn up the
pump pressure.
 Good width with well defined “horns” – optimised for
low emission spraying.
Use pump pressure to adjust to a pattern that has uniformity in gaps between streams, and no streaking Flush the Mix Chamber with solvent Turn Resin Pump regulator to Zero.

1 2
3
4
5 6
The Unit is now set up for Spray Trials. Use Checklist 04 for Spray Setup Checklist
ABNORMAL CONDITIONS OBSERVED AND CORRECTED
Abnormal Condition
 when corrected
OPERATORS NAME _______________________________________ DATE: ________________ SIGN OFF WHEN SET UP CHECKS ARE COMPLETED : __________________________ Note: Before spraying a part always check that the catalyst recirculation valve is closed and catalyst pump is primed.
Page 1 of 1